CHALLENGE
Colonial Pipeline commissioned the abandonment of 1,365LF of 36-inch diameter pipeline and 1,430LF of 40-inch pipeline. The pipeline ran perpendicular under a section of the San Jacinto River, which was approximately 1,000FT wide at the line crossing. The only access points were at each end of the pipeline. In addition, there was a horseshoe shape drop near the center of the line with an elevation change of approximately 6 to 10 feet. The situation allowed for one opportunity to grout the line correctly.
SOLUTION
Superior Grouting was sub-contracted to execute the pressure grouting scope of work. The work was performed over two consecutive nights. Grouting was scheduled to commence at 2AM and to be completed by 10AM. Logistics, high volume-high pressure injection equipment, job specific mix design characteristics, a steady flow of ready-mix trucks, general contractor support and proper line set up, were all imperative for a successful grouting operation in order to provide a 100% finished product.
PROJECT SUMMARY
With a well-coordinated execution plan, highly experienced grouting team and superb general contractor support, 819 CY of grout was installed, and the project was completed successfully within the time frame allotted.
Superior Grouting is a top choice for various grouting services in Houston, the entire Gulf Coast Region, and the areas nearby. It holds more than 35 years of experience in the grouting industry. Also, Superior Grouting is known for using the best tools and state-of-the-art equipment in providing clients with the best results.
Copyright © All rights reserved. 2024 • Terms of Use and Privacy Policy • Internet Marketing by Authority Solutions®